The crew that put the granite counter tops in the kitchen put the same granite around the fireplace.

P1010767

I built a nice little fire this morning while the contractor was installing the wood floors upstairs. I wanted to check out the fireplace to be sure it was working correctly while the contractor was still working at the house. Everything worked perfectly!

P1010769

P1010770

The tile man is putting the tile around the bath tub in the master bath. He is using this wet saw to cut the tiles. It is going to take him a lot of time because he is a perfectionist, but it is going to be so worth it. More to come.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: